Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    The Ore Wars 2002–2026: iron ore price cycles mapped for mine planners

    October 14, 2026|

    Reviewed by Tom Sullivan

    The Ore Wars 2002–2026: iron ore price cycles mapped for mine planners

    First reported on MINING.com

    30 Second Briefing

    Iron ore’s journey from a $13/t, annually negotiated benchmark in 2002 to a daily traded futures market peaking at $237.57/t in May 2021 is mapped in MINING.COM’s “Ore Wars” interactive, tracking 49 key inflection points. The timeline covers BHP’s failed $140 billion bid for Rio Tinto, the collapse to $37/t in December 2015, the Samarco and Brumadinho tailings disasters, and China’s push for yuan‑denominated pricing. For mine planners and marketers, it neatly links price shocks to supply surges, port stockpiles, freight rates and single‑buyer risk.

    Technical Brief

    • Seven “acts” segment market behaviour: Benchmark Years, Prompt Delivery, Iron Ageing, Long Winter, Taking Inventory, Disaster & Disruption, The Sequel.

    Our Take

    The inclusion of BHP, Rio Tinto and Anglo American in this iron ore history lines up with our recent TOP 50 coverage showing these three still dominate value creation in bulk commodities even as gold and battery metals grab more headlines.

    The record May 2021 iron ore price of $237.57/t in this timeline provides useful contrast to our 2026 copper pieces, where copper’s move above $14,500/t has now shifted more revenue weight towards copper for diversified groups like BHP and Rio Tinto.

    By anchoring the story in Australia, Brazil, China and crude oil, the piece effectively maps onto the same demand–supply axis that underpins our 73 keyword‑matched items on iron ore and crude oil, signalling that these regions remain the core risk lens for long‑term project planning in bulk commodities.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Expander pivot pins: reducing long-term maintenance costs for mine fleets
    Mining
    about 4 hours ago

    Expander pivot pins: reducing long-term maintenance costs for mine fleets

    Hidden costs from traditional pivot pin maintenance on haul trucks, forestry harvesters and excavators are driving interest in Expander System’s oversized pivot pins with tapered sleeves, according to Nord-Lock Group head of sales Robin Persson. The retrofit design allows installation in worn pivot eyes without line boring or welding, using conical sleeves to create full-surface contact and reduce clearance growth. For mine maintenance teams, this can cut repeated pin replacement shutdowns and lower life-cycle costs on high-load joints such as dump body hinges, loader booms and articulation points.

    Canadian Chrome Company First Nations committee: M&A risk notes for project teams
    Mining
    about 5 hours ago

    Canadian Chrome Company First Nations committee: M&A risk notes for project teams

    Canadian Chrome Company has formed a three-person First Nations steering committee, including former Attawapiskat Chief Theresa Okimaw-Hall and former Marten Falls Chief Lawrence Baxter, to advise on its Ring of Fire chromite, nickel, copper and platinum assets in Ontario’s James Bay Lowlands. The committee will provide Indigenous perspectives to prospective buyers or partners ahead of any sale or merger involving CCC’s 90% interest in the Koper Lake project and 30% in the Big Daddy project. Both projects remain at pre‑PFS stage, with no new economic analysis disclosed.

    Boron One Serbia PEA update: economics and design notes for mine planners
    Mining
    about 5 hours ago

    Boron One Serbia PEA update: economics and design notes for mine planners

    Boron One’s updated PEA for the Piskanja underground boron project in southern Serbia lifts the after-tax IRR to 89% and NPV (10% discount) to US$558.8 million, with unchanged initial capex of US$79.9 million and a sub‑one‑year payback, but shortens mine life to 13 years and trims average annual EBITDA to US$87.7 million. The plan now targets average yearly output of 157,600 tonnes of colemanite, 83,800 tonnes of ulexite and 25,000 tonnes of boric acid, at all‑in sustaining costs of US$231.44 per tonne. The revised study incorporates new geotechnical testing, a 3D resource model by borate type and a binding offtake for at least 25,000 tonnes of boron products per year, subject to permitting and plant qualification.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental