Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    JOEST Australia’s Pilgangoora expansion order: design and wear notes for mine engineers

    October 20, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    JOEST Australia has secured the largest order in its history from Pilgangoora Operations Pty Ltd for the PLS P2000 Expansion Project at the Pilgangoora hard rock lithium mine in Western Australia. The contract covers multiple vibrating screens, feeders and a primary grizzly, building on JOEST’s previous scope at the site. With the P1000 Expansion Project due to complete in 2025, the new package signals further scaling of front-end crushing and screening capacity, with implications for equipment sizing, wear-liner selection and maintenance planning in high-throughput lithium circuits.

    Technical Brief

    • Contract scope centres on large vibrating screens, high-capacity feeders and a heavy-duty primary grizzly.
    • Equipment is tailored for hard rock spodumene ore, implying high impact and abrasion design requirements.
    • High wear environment will drive liner material selection, change-out intervals and spares inventory planning.
    • Similar lithium expansions are increasingly standardising on large vibrating equipment to minimise footprint and civils.

    Our Take

    Alongside TOMRA Mining’s 22 ore sorters contracted for the same P2000 Expansion Project, JOEST Australia’s win suggests Pilgangoora Operations Pty Ltd is locking in a diversified suite of specialist equipment suppliers rather than relying on a single OEM for the lithium expansion phase.

    Pilgangoora’s record FY26 spodumene concentrate output and reduced unit operating costs, noted in other lithium pieces in our database, indicate that the P1000 and P2000 expansion pathway is being executed from a relatively low-cost operating base, which typically gives contractors like JOEST more schedule certainty and less brownfield interface risk than in distressed turnarounds.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Vulcan Elements–North Carolina rare earth magnets: design and supply notes for engineers
    Mining
    about 10 hours ago

    Vulcan Elements–North Carolina rare earth magnets: design and supply notes for engineers

    Vulcan Elements has partnered with the North Carolina Collaboratory and UNC-Chapel Hill chemist Yosuke Kanai to use quantum-mechanical simulations to predict how atomic-level changes affect rare earth magnet properties, backed by a $600,000 research award. The work feeds directly into Vulcan’s 1.1 million-square-foot Benson, North Carolina plant, designed for 10,000 t/y of magnet production and billed as the largest rare earth magnet factory outside China. Vulcan claims its material, technology, software, IP and ownership are fully decoupled from Chinese supply chains, aligning with its existing $1.4 billion US government-backed partnership with ReElement Technologies.

    Northern Star KCGM expansion: commissioning timeline and capacity cues for engineers
    Mining
    about 10 hours ago

    Northern Star KCGM expansion: commissioning timeline and capacity cues for engineers

    Northern Star Resources has completed the tie-in of its expanded KCGM processing plant in Western Australia, with commissioning of the integrated circuit now under way ahead of a planned production ramp-up in the second half of FY27. Early commissioning is focused on achieving stable, sustained operating conditions across the enlarged plant, rather than immediate throughput gains. For plant and process engineers, the timeline signals when additional milling, crushing and gold recovery capacity at KCGM is expected to start contributing materially to output and unit cost performance.

    Regis Resources and McPhillamys: funding optionality and schedule signals for engineers
    Mining
    about 10 hours ago

    Regis Resources and McPhillamys: funding optionality and schedule signals for engineers

    Regis Resources ended the September quarter with $1.28 billion in cash and bullion after generating $265 million in operating cash flow and collecting a $51 million break fee from Vault Minerals, following its decision not to match Genesis Minerals’ competing offer. The strengthened balance sheet gives Regis substantial optionality on funding the McPhillamys gold project in New South Wales, rather than relying heavily on project finance or equity. For mine planners and project engineers, this signals potential acceleration of McPhillamys approvals, early works and long-lead procurement once a final investment decision is made.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental